Overview
⚡
Calculators
10
🏗️
Coverage
Design & Analysis
📐
Standards
IEC / BS 7671
🔌
Phase Support
1Φ & 3Φ
Calculators
📋
Electrical Load Schedule
Total connected load, demand factor & diversity — panel sizing
Demand Load = Connected Load × Demand Factor | Diversity = Sum(Demands) / Max Simultaneous Demand
| Load Description | kW | PF | Phase | Qty | kVA | Current (A) |
|---|---|---|---|---|---|---|
| — | — | |||||
| — | — | |||||
| — | — |
Total Connected (kW)
—
Total kVA
—
Demand Load (kW)
—
After Diversity (kVA)
—
With Growth (kVA)
—
Full Load Current
—
Recommended Trafo
—
Main Breaker
—
Bus Bar (A)
—
🔒
Circuit Breaker Sizing
MCB / MCCB / ACB selection & rating
I_breaker ≥ 1.25 × I_FL (motor) | ≥ 1.0 × I_FL (others) | Round up to std size
Full Load Current
—
Design Current
—
Breaker Rating
—
Breaker Type
—
📏
Bus Bar Sizing
Copper / Aluminium bus bar cross-section
A = I / J [mm²] | J_Cu ≈ 1.6 A/mm² (enclosed) | Temp rise ≤ 35°C above ambient
Min. Area (mm²)
—
Std. Size (mm×mm)
—
Current Density
—
SC Withstand
—
🌍
Earthing & Grounding
Earth electrode resistance & conductor size
R = ρ/(2πL) × [ln(4L/d)−1] | Parallel: R_total = R_rod / N × F | GC = √(I²×t)/k
Single Rod R (Ω)
—
Combined R (Ω)
—
Status
—
GC Min. Size
—
💡
Lighting Design (Lumen Method)
Fixture count, lux level & power density
N = (E × A) / (F × UF × MF) | LPD = (N × W_lamp) / A [W/m²]
Room Area
—
Room Index (k)
—
No. of Fixtures
—
Achieved Lux
—
LPD (W/m²)
—
Total Load (W)
—
Layout (rows×cols)
—
⚙️
Motor Starter Selection
DOL / Star-Delta / VFD starting current & torque
I_start_DOL = 6–8 × I_FL | Star-Delta: 1/3 × I_DOL | VFD: 1.0–1.5 × I_FL
Full Load Current
—
Starting Current
—
Starting Torque
—
Contactor Rating
—
🔁
Distribution Transformer Sizing
kVA rating, FLC & %loading
S_trafo ≥ Total_Demand_kVA / 0.85 | FLC = S × 1000 / (√3 × V) | Loading% = Demand / S × 100
Required kVA
—
Standard kVA
—
HV FLC (A)
—
LV FLC (A)
—
Loading %
—
Fault Current (kA)
—
HV Cable Size
—
🛡️
Relay & Protection Settings
OC relay pickup, TMS & instantaneous settings
Pickup I = CTR × I_pickup_pu | TMS: t = TMS × K / [(I/Ip)^α − 1] | Inst = 8–12 × I_FL
Pickup Current (A)
—
Pickup (CT sec, A)
—
Trip Time at Fault
—
Inst. Setting (A)
—
📐
Power Factor Correction
Capacitor bank & APFC sizing
Qc = P(tanφ₁−tanφ₂) | C = Qc×10⁶/(2πf×V²) [μF] | Steps = Qc / Step_kVAR
Qc Required (kVAR)
—
Cap per Phase (μF)
—
kVA Reduction
—
Step Size (kVAR)
—
🏭
Electrical Engineering All-in-One Summary
Complete system: Load → Transformer → Breaker → Cable → Earthing → PF Correction
Full electrical system snapshot from connected load to final installation recommendations
Demand Load (kW)
—
Demand kVA
—
Full Load Current
—
Transformer (kVA)
—
Main Breaker (A)
—
Cable Size (mm²)
—
Fault Current (kA)
—
Earth Rod R (Ω)
—
PF Correction (kVAR)
—
Bus Bar Size
—