Electrical Engineering Calculator Dashboard

Electrical Engineering Calculator Dashboard
ELECTRICAL ENGINEERING CALC Dashboard 10 Calculators
Overview
Calculators
10
🏗️
Coverage
Design & Analysis
📐
Standards
IEC / BS 7671
🔌
Phase Support
1Φ & 3Φ
Calculators
📋
Electrical Load Schedule
Total connected load, demand factor & diversity — panel sizing
Demand Load = Connected Load × Demand Factor | Diversity = Sum(Demands) / Max Simultaneous Demand
Load Description kW PF Phase Qty kVA Current (A)
Total Connected (kW)
Total kVA
Demand Load (kW)
After Diversity (kVA)
With Growth (kVA)
Full Load Current
Recommended Trafo
Main Breaker
Bus Bar (A)
🔒
Circuit Breaker Sizing
MCB / MCCB / ACB selection & rating
I_breaker ≥ 1.25 × I_FL (motor) | ≥ 1.0 × I_FL (others) | Round up to std size
Full Load Current
Design Current
Breaker Rating
Breaker Type
📏
Bus Bar Sizing
Copper / Aluminium bus bar cross-section
A = I / J [mm²] | J_Cu ≈ 1.6 A/mm² (enclosed) | Temp rise ≤ 35°C above ambient
Min. Area (mm²)
Std. Size (mm×mm)
Current Density
SC Withstand
🌍
Earthing & Grounding
Earth electrode resistance & conductor size
R = ρ/(2πL) × [ln(4L/d)−1] | Parallel: R_total = R_rod / N × F | GC = √(I²×t)/k
Single Rod R (Ω)
Combined R (Ω)
Status
GC Min. Size
💡
Lighting Design (Lumen Method)
Fixture count, lux level & power density
N = (E × A) / (F × UF × MF) | LPD = (N × W_lamp) / A [W/m²]
Room Area
Room Index (k)
No. of Fixtures
Achieved Lux
LPD (W/m²)
Total Load (W)
Layout (rows×cols)
⚙️
Motor Starter Selection
DOL / Star-Delta / VFD starting current & torque
I_start_DOL = 6–8 × I_FL | Star-Delta: 1/3 × I_DOL | VFD: 1.0–1.5 × I_FL
Full Load Current
Starting Current
Starting Torque
Contactor Rating
🔁
Distribution Transformer Sizing
kVA rating, FLC & %loading
S_trafo ≥ Total_Demand_kVA / 0.85 | FLC = S × 1000 / (√3 × V) | Loading% = Demand / S × 100
Required kVA
Standard kVA
HV FLC (A)
LV FLC (A)
Loading %
Fault Current (kA)
HV Cable Size
🛡️
Relay & Protection Settings
OC relay pickup, TMS & instantaneous settings
Pickup I = CTR × I_pickup_pu | TMS: t = TMS × K / [(I/Ip)^α − 1] | Inst = 8–12 × I_FL
Pickup Current (A)
Pickup (CT sec, A)
Trip Time at Fault
Inst. Setting (A)
📐
Power Factor Correction
Capacitor bank & APFC sizing
Qc = P(tanφ₁−tanφ₂) | C = Qc×10⁶/(2πf×V²) [μF] | Steps = Qc / Step_kVAR
Qc Required (kVAR)
Cap per Phase (μF)
kVA Reduction
Step Size (kVAR)
🏭
Electrical Engineering All-in-One Summary
Complete system: Load → Transformer → Breaker → Cable → Earthing → PF Correction
Full electrical system snapshot from connected load to final installation recommendations
Demand Load (kW)
Demand kVA
Full Load Current
Transformer (kVA)
Main Breaker (A)
Cable Size (mm²)
Fault Current (kA)
Earth Rod R (Ω)
PF Correction (kVAR)
Bus Bar Size